美国前总统比尔.克林顿
书面致辞
首页>>合作信息>>
5MW Photovoltaic Power Generation Project

 

I. Project Background

The development of renewable energy has been a global issue.  The application of solar energy has the best prospect.  Among the technologies of using solar energy, photovoltaic power generation is the most reliable method and easiest for industrialization.

The project uses battery board to receive the solar power at the maximum level by relocating position to the sun.  The sunlight panel has a 270 degree of up-and-down and left-to-right rotation which generates 35% more power than common solar system and operates continuously for 25 years.

II. Construction Scale and Production Plan

Total area 5000 , 1670 battery boards, expected annual energy output 5MW.

III. Market Analysis and Economic Benefit Forecast

Expected annual sales income 110 million RMB

IV. Total Project Investment and Financing Arrangement

500 million, the Ministry of Finance, Ministry of Sciences and Technology, Bureau of Energy issued policies to give subsidy to cover 50% of total investment.

V. Cooperation Ways

Joint venture

VI. Foreign Investment and Constitution

Funds

VII. Project Construction Venue

Economic and Technological Development Zone, Jilin City

VIII. Project Progress

Completed the survey of industrial policies; coordinating with Development and Reform Commission of Jilin Province for financial support.

IX. Outline of Project Organizer

The headquarter has production plant of 50,000 , branch in Dalian city 200,000, branch in Fuzhou city 70,000, branch in Shandong Province 23,000, annual sales reaches 16.5 billion RMB. Employees including academicians of Chinese Academy of Engineering, 72 senior technicians, 130 engineers.

X. Contact Methods

  Investment Promotion Bureau 3, Economic and Technological Development Zone, Jilin City

  Contact Person: Ms. Ma Yiping

  Tel: 0086-432-63451944

版权所有: 亚太总裁协会(APCEO), 亚太财富(北京)经济咨询中心, 亚太财富(北京)知识产权代理有限公司 备案/许可证编号为: 京ICP备12048601