I. Project Background
The development of renewable energy has been a global issue. The application of solar energy has the best prospect. Among the technologies of using solar energy, photovoltaic power generation is the most reliable method and easiest for industrialization.
The project uses battery board to receive the solar power at the maximum level by relocating position to the sun. The sunlight panel has a 270 degree of up-and-down and left-to-right rotation which generates 35% more power than common solar system and operates continuously for 25 years.
II. Construction Scale and Production Plan
Total area 5000 ㎡, 1670 battery boards, expected annual energy output 5MW.
III. Market Analysis and Economic Benefit Forecast
Expected annual sales income 110 million RMB
IV. Total Project Investment and Financing Arrangement
500 million, the Ministry of Finance, Ministry of Sciences and Technology, Bureau of Energy issued policies to give subsidy to cover 50% of total investment.
V. Cooperation Ways
Joint venture
VI. Foreign Investment and Constitution
Funds
VII. Project Construction Venue
Economic and Technological Development Zone, Jilin City
VIII. Project Progress
Completed the survey of industrial policies; coordinating with Development and Reform Commission of Jilin Province for financial support.
IX. Outline of Project Organizer
The headquarter has production plant of 50,000 ㎡, branch in Dalian city 200,000㎡, branch in Fuzhou city 70,000㎡, branch in Shandong Province 23,000㎡, annual sales reaches 16.5 billion RMB. Employees including academicians of Chinese Academy of Engineering, 72 senior technicians, 130 engineers.
X. Contact Methods
Investment Promotion Bureau 3, Economic and Technological Development Zone, Jilin City
Contact Person: Ms. Ma Yiping
Tel: 0086-432-63451944